BRS Pros installed carbon fiber straps for Beverly Grant at the Radical Hotel. Fortress carbon fiber/Kevlar unidirectional carbon fiber straps with top rim joist plates and bottom anchor footers assembly was installed vertically at four foot centers. The foundation wall was scarified and cleaned smooth where the straps are located on the wall.
The carbon fiber/kevlar top bracket was secured/bolted to the rim joists. Then, the steel dual leg bottom anchors were drilled and epoxied to the floor to prevent wall shearing, making it 125 times stiffer than the competition. This makes the bottom plate anchors the best in the industry. High strength epoxy was then applied to the wall and straps to create a life of the structure warranty where installed. Straps may be painted in the future for aesthetic purposes.
It was a pleasure helping Beverly Grant make the hotel safe, happy & healthy for new customers!